New 33,000 sf building. Install PVC drainage for over 450 floor drains. Install cast iron for roof drains. Install gas piping for roof top units and (2) 1,000,000 BTU tankless water heaters. Install restroom fixtures, surgery tables, wash tubs, and sinks.